Loading...

Enlistments

View More

Quality Control

KES products are designed, assembled and tested as per local, regional and international standards. We conduct prescribed routine tests prior to delivery of every panel. Our quality engineers conduct tests and quality checks prior to commissioning at site. On request we also carry out on-site performance tests under full Load conditions.

Factory Test

  • Visual inspection
  • Mechanical inspection
  • Electrical inspection
  • Insulation Resistance Test
  • High Voltage Test
  • Functional Test

Preventive Periodic Maintenance

Annual maintenance contracts. Our Service manager will inspect the site and understand your requirements for work to be carried out. A proposal will be forwarded to you detailing scope and intervals of maintenance works to be executed on site.

  • Visual Survey and Inspection
  • Functional Testing
  • Replacement of faulty accessories

Site Modification Works

All modification requests from clients are routed through our engineering team to review and conduct due diligence analysis, prepare costing and outline an execution plan. Our engineering team will review the functional aspects of the jobs and provide technical drawings for customer approval. We have executed numerous modification works in live sites such as textile industries and pharma where planned shutdown is coordinated with clients for executing the works.

Health And Safety

Our team operates in accordance with international safety standards. Prior to commencement of work our team ensures the following conditions in the site are met:

  • Safety Isolation
  • Protection against re-closing
  • Earthing and short-circuiting
  • Cover or barrier adjacent live parts

Our team will conduct the necessary tests to confirm complete isolation of all systems from power supply. All our personnel are provided with PPE and other safety equipment.